2025.05.24 (토)

  • 구름많음동두천 17.6℃
  • 맑음강릉 20.3℃
  • 구름많음서울 18.2℃
  • 맑음대전 18.5℃
  • 맑음대구 19.0℃
  • 맑음울산 20.0℃
  • 맑음광주 18.4℃
  • 맑음부산 19.1℃
  • 맑음고창 18.4℃
  • 맑음제주 21.3℃
  • 구름많음강화 15.3℃
  • 구름조금보은 17.3℃
  • 맑음금산 18.1℃
  • 맑음강진군 18.7℃
  • 구름조금경주시 20.7℃
  • 맑음거제 19.7℃
기상청 제공

World

How Many Cranes Does It Take to Unload a Giant Boxship at Port Klang?



During CMA CGM Kerguelen’s maiden call at Port Klang Port Terminal in Malaysia, the terminal set up a unique arrangement of cranes to match the length of 398-meter vessel.

So exactly how many cranes did it take to unload the vessel? Twelve. Twelve cranes were used simultaneously to unload the ship, which according to CMA CGM is a company record.

CMA CGM Kerguelen was delivered to CMA CGM on March 21, 2015. With a TEU capacity of 17,722 TEU, the vessel is group’s largest containership to date. The ship is the first in a series of 6 vessels of the same size that will be delivered in 2015.
(Source : gCaptain.com)


배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너