2026.01.30 (금)

  • 흐림동두천 -10.1℃
  • 구름조금강릉 -6.2℃
  • 구름조금서울 -9.0℃
  • 맑음대전 -8.6℃
  • 맑음대구 -4.9℃
  • 흐림울산 -4.0℃
  • 맑음광주 -5.6℃
  • 구름조금부산 -2.6℃
  • 구름조금고창 -6.2℃
  • 흐림제주 2.4℃
  • 흐림강화 -9.1℃
  • 흐림보은 -10.8℃
  • 흐림금산 -10.2℃
  • 흐림강진군 -3.4℃
  • 흐림경주시 -4.7℃
  • 구름많음거제 -1.7℃
기상청 제공

World

How Many Cranes Does It Take to Unload a Giant Boxship at Port Klang?



During CMA CGM Kerguelen’s maiden call at Port Klang Port Terminal in Malaysia, the terminal set up a unique arrangement of cranes to match the length of 398-meter vessel.

So exactly how many cranes did it take to unload the vessel? Twelve. Twelve cranes were used simultaneously to unload the ship, which according to CMA CGM is a company record.

CMA CGM Kerguelen was delivered to CMA CGM on March 21, 2015. With a TEU capacity of 17,722 TEU, the vessel is group’s largest containership to date. The ship is the first in a series of 6 vessels of the same size that will be delivered in 2015.
(Source : gCaptain.com)


배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너
배너